
|
Commissioning services for a three-phase energy performance contract, from project inception through monitoring and verification for all city buildings, as well as energy procurement (gas and electric) for all city and school buildings. Size: 2 million square feet Overall value: $2.0 million |
City and School District of Concord, New Hampshire |
|
Through an RFP process, ADI was ranked #1 for technical expertise in energy procurement and performance contracting, RFP development, and ongoing commissioning. ADI worked with the City to develop a master energy procurement plan that is the basis of their procurement policy for oil, gas, propane, and electricity. ADI continues to provide services through a commissioning process for the performance contract. Under the contract, ADI developed the RFP and score matrix, and guided the City through the RFP and the operations aspects. ADI negotiated the contract with the ESCO to insure that the contract matched the promises in the ESCO’s proposal regarding the scope of services and M&V and commissioning plan. |
UNIQUE VALUE TO CUSTOMER |
|
2348 Post Road, Suite 21 Warwick, RI 02886 Phone: 401.524.5334 Fax: 877.727.3699 www.ad-institute.com E-mail: info@ad-institute.com www.ad-institute.com |

|
n RFP development n Energy savings analysis n Commissioning n Preparing/analyzing energy savings M&V reports n Energy audit development and n EMS trending n Energy modeling n Energy procurement |
|
n Lighting n Lighting controls n EMS n Rooftop units n Boilers n Variable speed drives |
