Text Box: SUMMARY

ADI Helped Chevron Energy Solutions develop two of the first energy Performance contracts under the state of Rhode Island Energy Performance Contracting Program.  ADI developed the design/build team for the project and completed the necessary preliminary design and economic analysis for the State to award the contract to Chevron.

 

Overall value: $1.4 million

 

  Chevron State of Rhode Island

     (Chariho Regional School District)

The State of Rhode Island had a terrible situation on its hands.  In less than four months the vocational school was going to need heat because the current system was no longer effective.  The school department personnel were relying on portable electric heaters in the classrooms as well as requesting some students to wear coats to class.

ADI completed the conceptual design of a new heating system and developed a solution with its client to install new heating system throughout the building.  The work was completed in less than five months with better than expected performance.

UNIQUE VALUE TO CUSTOMER

Phone: 401.524.5334

Fax: 877.727.3699

www.ad-institute.com

E-mail: info@ad-institute.com

 

Text Box: SERVICES

n Energy audit development and
analysis

n Energy savings analysis

n Conceptual Design

n Preparing/analyzing energy savings M&V reports

n Energy Trending

n Energy modeling

Text Box: MEASURES

n Electric heat to Oil-fired

             Hydronic heat