Commissioning services for a performance contract, from project audit phase through monitoring and verification for the entire complex. Size: 12 buildings, over 1 million square feet Overall value: $16 million |
Bridgewater (MA)Correctional Facility |
|
ADI reviewed and approved a $16 million project from the energy audit phase through the operations phase. The Massachusetts Division of Capital Asset Management (DCAM) requested that ADI commission all energy conservation measures and evaluate any pricing project changes that accrued over the term of the contract. Commissioning plans included pre-functional and functional tests. ADI also completed a detailed savings and costing analysis of all ECMs. These tests determined that the EMS needed to be further commissioned by the ESCO in order to provide the savings as stipulated. |
UNIQUE VALUE TO CUSTOMER |
|
2348 Post Road, Suite 21 Warwick, RI 02886 Phone: 401.524.5334 Fax: 877.727.3699 www.ad-institute.com E-mail: info@ad-institute.com www.ad-institute.com |

|
n Energy audit development and n Energy savings analysis n Commissioning n Preparing/analyzing energy savings M&V reports n EMS trending n Energy modeling |
|
n Lighting n HVAC upgrades n EMS n Water conservation I-Con system n Steam traps n Variable speed drives n Boiler n Cogeneration n Power factor correction n Laundry Conservation measure |